Today we had a working meeting at the mausoleum site to clarify the details of the installation and electrification between Eng. Miroslav Yamakov (the author of the electrical project) and the team of Neon.BG, who will install the installation. The unsolvable problem we encountered is who will ultimately authorize the connection between the electrical panel on the site (operated by the Sofia City Art Gallery, which does not have a full-time electrician) and the installation panel that Neon.BG will install next to the former.
Published in
Process